Summer 2010 SiPM Testing
This page contains documentation on testing of various
SiPM devices during Summer 2010 at BU.
We received a shipment of 3 devices in Feb 2010 but are just starting now (June) to evaluate them.
There are 3 devices in PGA (pin-grid array) 0.1" spacing packages.
Test Setup Instrumentation
Task List
Below is a list of jobs to be done to get started testing
- Read about SiPMS WikiPedia
- Lookup the references from the last page of the RMD document and read as many as possible.
- Purchase sockets to hold the three devices (DigiKey
or Newark
)
- Design a simple ExpressPCB
circuit board to hold the package, and provide required connections
- Set up a dark box with the required connectors
- Set up the Keithley HV supply (when it arrives around the end of June) for I-V curves
- Install drivers for LeCroy LT584 oscilloscope (Ethernet) and HP 8112A signal generator
--
EricHazen - 10 Jun 2010