High Rates Test Procedure

Test procedure for building events from uHTR, while using TTT as TTC source.
  1. Make sure AMC13 and uHTR are installed properly in the crate and that the optical fiber from TTT is connected to AMC13 properly (top fiber to bottom and vice versa)
  2. Prepare uHTR and enable DAQlinks and local triggers. Using uHTR, follow recipe here.
  3. Prepare AMC13 for data taking and enable link to desired uHTRs (additional information here):
    • insert command line printouts
  4. Set high prescaling:

-- DavidZou - 12 Jul 2013