$ cd ~ehazen/GetStatus $ ./getAllVersions.sh | ./parseVersions.pl Crate Bus Slot Xilinx LRB VME S/N FED ==================================== 4 caen:0 10 0x3018 0x010a 0x0104 2001 700 4 caen:0 20 0x3018 0x010a 0x0104 2002 701 0 caen:1 10 0x3018 0x010a 0x0104 2174 702 0 caen:1 20 0x3018 0x010a 0x0104 2176 703 .... remainder of list truncated ...Here is Dick Kellogg's list
S/N | Location | Notes |
---|---|---|
2001 | 904 | Tested in MWGR 15 |
2002 | 904 | |
2003 | 904 | |
2004 | 904 | |
2005 | BU - Test stand | |
2006 | Whitman | To be destructively tested for soldering temperature profiles |
2007 | BU | Ethernet resistor replaced - re-test |
2008 | BU | Ethernet resistor replaced - re-test |
2009 | BU | Tested. No errors |
2010 | BU |
S/N![]() |
Location | Notes | Date shipped | Status |
---|---|---|---|---|
2129 | FED_730 | Tested. | 5/26 | OK |
2130 | *904 Hospital | Orbit number mismatches as FED 731 01-jul-2009 (removed) | 5/26 | Sick |
2131 | FED_720 | Tested. | 5/26 | OK |
2132 | FED_718 | Tested. | 5/26 | OK |
2133 | 904 Hospital | Removed due to CRC errors during intervention on other DCC issues. Suspect spurious issue: http://cmsonline.cern.ch/cms-elog/637389![]() |
3 Aug 2011 | OK |
2134 | BU | Returned to BU because of alleged mis-matches | 5/26 | Sick |
2135 | FED_724 | Tested. HTR13 LED broken. Now fixed. | 5/26 | OK |
2136 | BU | Shipped back to BU 6/9/09 per dick | to CERN 5/26 | OK |
2137 | FED_725 | Tested. Initially 2 errors. 2nd time tested-no errors. Probably a wiring issue. | 5/26 | OK |
2138 | FED_726 | Tested. | 5/26 | OK |
2139 | FED_716 | Installed on 3 Aug 2011 http://cmsonline.cern.ch/cms-elog/637389![]() |
3 Aug 2011 | OK |
2140 | FED_728 | Tested. Initially 2 errors. 2nd time tested-no errors. Probably a wiring issue. | 5/26 | OK |
2141 | FED_723 | Tested. | 5/26 | OK |
2142 | FED_701 | Prior incident as different FED (3/24/10): Was removed when we had an issue where no HTRs were sending data. No other symptoms point to DCC failure | 6/11/10 | OK |
2143 | CERN | Tested. Ethernet error(RJ 45). Was not fixed. Returned to BU 6/9/09. Tested/shipped back to CERN | 8/18/11 | OK |
2144 | FED_722 | Tested. | 5/26 | OK |
2145 | 904 Spares | "Stops sending events down SLINK and goes to OFW at 80 kHz" . Tested OK by PDL 4/1/11 | 11/16 | OK |
2146 | BU | Tested. Pin9 of HTR14 RJ45 to U14 line open. Could be a PCB problem. | Sick | |
2147 | BU | Tested. Two broken LEDs, Ethernet error(RJ 45), and CRC error. R25 cold solder,D25 is also missing. Errors fixed as of 6/3 | OK | |
2148 | FED_721 | Tested. | 5/26 | OK |
2149 | BU | Tested. U0 soldering problem(most likely because U10 looks OK) Multiple lines to U10 without connection | Sick | |
2150 | FED_719 | Tested. | 7/1 | OK |
2151 | FED_712 | Tested. | 6/1 OK | |
2152 | 904 Hospital | CRC Errors in Event Builder but not LRB. All errors from single LRB chip. See details below | 6/11/2010 | Sick |
2153 | FED_710 | Tested. | 6/1 | OK |
2154 | FED_704 | Installed on 12 Jul 2011 | 12 Jul 2011 | OK |
2155 | FED_729 | Installed on 3 Aug 2011 http://cmsonline.cern.ch/cms-elog/637389![]() |
3 Aug 2011 | OK |
2156 | FED_714 | Tested. | 6/1 | OK |
2157 | *CERN | Tested. Warped board | 6/1 | OK/warped |
2158 | BU | Problem: DSP FW version 0x301c reports as version 0x0 on this board. Can program manually with DCC2Tool.exe w/o issues. CRC of DSP FW reported by DCC2Tool.exe is correct. |
6/1 (returned) | Sick |
2159 | FED_713 | Tested. 8/18/11 fail LRB4 test, however, this LRB is not in use (no spigots attached to HTRs) | 6/1 | LRB4 sick |
2160 | 904 Hospital | Removed from FED 700 due to UERR on spigot 13 - 10/29/09. | 6/1 | Sick |
2161 | FED_708 | Tested. | 6/1 | OK |
2162 | 904 Hospital | 3 Aug 2011: Removed because it is not sending events over VME. Perhaps DAQ software issue? http://cmsonline.cern.ch/cms-elog/637389![]() |
6/1 | OK |
2163 | BU | DDR memory chip replaced | 2 Aug 2011 | OK |
2164 | FED_715 | Tested. | 6/9 | OK |
2165 | FED_711 | Tested. | 6/9 | OK |
2166 | FED_731 | Tested. | 6/9 | OK |
2167 | BU | Tested. Spigot CRC error/SLINK error | Sick | |
2168 | FED_707 | Tested. | 6/9 | OK |
2169 | FED_706 | Tested. | 6/9 | OK |
2170 | BU | Tested. CRC errors. Spigot zero bad? | Sick | |
2171 | FED_717 | Tested. | 6/9 | OK |
2172 | 904 Hospital | CRC errros on LRB FPGA serving spigots 12,13,14. Elog: http://cmsonline.cern.ch/cms-elog/605813![]() Replaced LRB4 @ CERN shop. All FW in FLASH except VME FW corrupted. Now fails memory test on LRB2? Elog: http://cmsonline.cern.ch/cms-elog/689158 ![]() |
5 Oct 2011 | Sick |
2173 | FED_705 | Tested. | 6/9 | OK |
2174 | FED_702 | Tested. | 6/9 | OK |
2175 | CERN | Tested. Broken LED-->VME. Declared good, shipped to CERN | 8/18/11 | OK |
2176 | FED_727 | 31 July 2011: Removed from FED 703 due to BcN mismatch problems. This occurred during ramping and is likely not an actual DCC issue: http://cmsonline.cern.ch/cms-elog/631675![]() 3 Aug 2011: Installed as FED 727 http://cmsonline.cern.ch/cms-elog/637389 ![]() |
3 Aug 2011 | OK |
2177 | FED_709 | Tested. | 7/1 | OK |
2178 | FED_700 | Tested. Installed to replace 2160 - 10/29/09 | 7/1 | OK |
2179 | FNAL | Tested. | Ship to FNAL 2011-05-12 | OK |
2180 | BU | Tested. TTS link error. SLINK error. | Sick | |
2181 | 904 Hospital | CRC erros and "miscellaneous errors" during intervention on a different DCC problem: http://cmsonline.cern.ch/cms-elog/637389![]() |
3 Aug 2011 | Sick |
2182 | *CERN | Tested. | 7/1 | OK |
2183 | BU | Tested. | Ship to MN 2011-05-12 | OK |
2184 | BU | Tested. CRC error, SLINK error. "event size of 4800 words is unreasonable" | Sick | |
2185 | CERN | Tested. Shipped to CERN | 8/18/11 | OK |
2186 | CERN | Tested. Shipped to CERN | 8/18/11 | OK |
2187 | BU | Board is warped. won't fit into crate. | Sick | |
2188 | BU | Tested. Ethernet RJ45 error. | Sick | |
2189 | CERN | Tested. Shipped to CERN | 8/18/11 | OK |
2190 | CERN | Tested. | 1/10 | OK |
2191 | CERN | Tested. | 1/10 | OK |
2192 | CERN | Tested. | 1/10 | OK |
2193 | BU | Returned ~3/10/10 w/ spigot 3 problem (CASTOR) | 1/10 | Sick |
2194 | BU | Tested. | 3/11/11 -- problems with spigots 3-5 (Eric/Dick) | Sick |
2195 | CERN | Tested. Shipped to CERN | 8/18/11 | OK |
2196 | CERN | Tested. Shipped to CERN | 8/18/11 | OK |
2197 | BU | Tested. | OK | |
2198 | BU | Not ever tested? | ? |
Installed HCAL DAQ version 10.4.6 (unrelated, needed for different test) Altered FedkitTest_LTClistenToTTS_from_slot20 to take SLINK data from slot 20. Blasted high rate events at DCC. Due to SLINK readout (with only CRC error checking), effective rate was limited to 34 kHz since this DCC was providing TTS signal. Readout 10E6 events at this rate with no SLINK errors. Good enough for me.-- PhilLawson - 24 Jan 2012