Summer 2010 SiPM Testing

Line: 13 to 13
 

Test Setup Instrumentation

Added:
>
>
  • SiPM Rad Testing – Wiki page with software and documentation from previous tests
 

Task List

Line: 24 to 25
 
  • Design a simple ExpressPCB circuit board to hold the package, and provide required connections
  • Set up a dark box with the required connectors
  • Set up the Keithley HV supply (when it arrives around the end of June) for I-V curves
Added:
>
>
  • Install drivers for LeCroy LT584 oscilloscope (Ethernet) and HP 8112A signal generator
 

-- EricHazen - 10 Jun 2010

 