Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Summer 2010 SiPM Testing | ||||||||
Line: 13 to 13 | ||||||||
Test Setup Instrumentation
| ||||||||
Added: | ||||||||
> > |
| |||||||
Task List | ||||||||
Line: 24 to 25 | ||||||||
| ||||||||
Added: | ||||||||
> > |
| |||||||
-- EricHazen - 10 Jun 2010 |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Summer 2010 SiPM Testing | ||||||||
Line: 10 to 10 | ||||||||
There are 3 devices in PGA (pin-grid array) 0.1" spacing packages. | ||||||||
Added: | ||||||||
> > | Test Setup Instrumentation
| |||||||
Task ListBelow is a list of jobs to be done to get started testing |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Added: | ||||||||
> > |
Summer 2010 SiPM TestingThis page contains documentation on testing of various SiPM devices during Summer 2010 at BU. We received a shipment of 3 devices in Feb 2010 but are just starting now (June) to evaluate them. There are 3 devices in PGA (pin-grid array) 0.1" spacing packages.Task ListBelow is a list of jobs to be done to get started testing
|