Difference: AMC13GeneralToDo (1 vs. 2)

Revision 212 Jun 2013 - EricHazen

Line: 1 to 1
 
META TOPICPARENT name="HcalDTC"
Deleted:
<
<
 See also FinalAMC13Discussion page at CERN with collaborators' requests

Hardware

Line: 11 to 9
 

Firmware

Added:
>
>
  • Separate DAQ and TTC resets to avoid clock disruption
 
  • Maintain history of TTS state changes
Added:
>
>
  • Release AMC-AMC13 backplane link firmware
    • Version with trigger path disabled for full 5.0Gb/s usable bandwidth
 

Revision 112 Jun 2013 - EricHazen

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="HcalDTC"

See also FinalAMC13Discussion page at CERN with collaborators' requests

Hardware

  • IBERT testing of optical and backplane links
  • Extra signals from T2 to T3 to support TTC upgrade (see CERN page above)

Firmware

  • Maintain history of TTS state changes

-- EricHazen - 12 Jun 2013

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2021 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback